Current public state: controlled V3 test-mainnet rehearsal
Public launch status: NO-GO until closure evidence is complete
Current public line: v2.9.9 Pure Code over the canonical v2.9.8 runtime
What this roadmap is for
This lite roadmap is the public-facing version of the launch path. It is not a promise that mainnet is already scheduled as a fixed live event. It describes the order of work required before any public mainnet decision can be made.
Current phase
ZION is operating as a controlled rehearsal runtime with:
- one public primary host for web, explorer, RPC, and pool ingress,
- internal validation lanes for quorum and synchronization,
- public docs, monitoring, and API surface,
- archived 2.9.7 -> 2.9.8 -> 2.9.9 release lineage for audit traceability.
This is a public rehearsal environment, not a declared live public mainnet.
Launch sequence
Phase 1 — Rehearsal stability
- keep the controlled runtime healthy,
- keep node, pool, explorer, and telemetry aligned,
- collect runtime evidence and operational samples.
Phase 2 — Closure evidence
- close external audit work,
- prove explorer and API behavior publicly,
- finish wallet distribution readiness,
- finish recovery and operational evidence.
Phase 3 — Launch-readiness package
- freeze the public launch configuration,
- publish the closure report,
- confirm governance and listing-readiness material,
- decide whether public launch can move from NO-GO to GO.
Phase 4 — Public mainnet decision
- if closure criteria are satisfied, open genesis and launch operations,
- if they are not, continue rehearsal and do not declare launch.
What remains open
| Area | Status | Public note |
|---|---|---|
| External audit | OPEN | No public close-out yet |
| Explorer closure evidence | OPEN | Public proof still needs to stay current |
| Wallet readiness | OPEN | Final distribution flow still incomplete |
| Final consensus / launch config | IN PROGRESS | Public launch version not frozen |
| Independent miner / node evidence | OPEN | More external operational validation needed |
| Listing package | IN PROGRESS | CoinGecko / CMC prep is still being cleaned up |
While these remain open, public launch remains NO-GO.
Public reading guide
/networkshows the active rehearsal topology./docsis the public documentation hub./downloadcarries current binaries for the public line./api-referenceexposes the current RPC / REST surface./roadmapshows the broader delivery track and gate logic.
Time framing
End-2026 remains a target window for decision-making and possible launch readiness, not proof that a launch is already fixed or guaranteed.